Installation
Prior to installing the Heater/Cooler system, unpack the components and verify that the following items are included:
- All systems:
- Heated TappingMode Probe Holder
- Heating Element and/or Heating/Cooling Element
- Thermal Applications Controller (TAC)
- Tip Heater Cable
- Heater extension cable
- Silicone rubber seals
- Manifold
- Heater/Cooler Base
- Gas Ring
- Dimension Heater/Cooler probe loading stand
- Systems with Sample Cooling:
- Reservoir Bottle and Tubing
- Ice Bucket
- Peristaltic pump
- Pulse damper
- Copper ring
Installation Procedures:
| www.bruker.com
|
Bruker Corporation |
| www.brukerafmprobes.com
|
112 Robin Hill Rd. |
| nanoscaleworld.bruker-axs.com/nanoscaleworld/
|
Santa Barbara, CA 93117 |
| |
|
| |
Customer Support: (800) 873-9750 |
| |
Copyright 2010, 2011. All Rights Reserved. |
Open topic with navigation